Project Summary:

This project will replace the existing traffic signal equipment and make intersection geometry improvements at the intersections of 3rd Street at Woodlawn Avenue and 3rd Street at Hawthorne Drive. Infrastructure Engineering Incorporated (IEI) is the engineering design consultant for this project.

 

Project Timeline:

  • Design: 2026
  • Construction: TBD summer 2027

 